DE  |  EN  | 

TECHNICAL INFRASTRUCTURE



Four blocktrain tracks, 630 m of quay and the largest trimodal container gantry crane on the upper Danube enable direct and efficient container transhipment from ship to train, truck or into the depot, at a single hub. The electrified rail infrastructure with signal safeguards offers all rail transport companies direct and inexpensive access to trimodal transhipment possibilities. The transfer station operated by Ennshafen OÖ Ltd. with six blocktrain tracks and three more tracks ensures high-performance train management at the container terminal.



{back_top_label}